What is the steps to move heavy machinery with machine moving skates?

To move heavy machinery with machine moving skates, follow these steps:

machine moving skate (8)machine moving skate (7)

1) Assess the weight and dimensions of the machine: Before moving the machine, determine its weight and dimensions to ensure that the machine moving skates can handle the load.

2) Prepare the machine: Clean the machine's bottom surface and remove any debris that could interfere with the skate movement. If necessary, remove any protrusions or attachments that might obstruct the movement.

3) Select the appropriate skates: Choose the appropriate machine moving skates based on the machine's weight and size. Make sure that the skates are in good condition and have sufficient capacity for the load.

4) Position the skates: Place the machine moving skates under the machine's legs or corners, ensuring that they are properly aligned with the load. Secure the machine to the skates using straps or clamps if necessary.

5) Move the machine: Use a manual or motorized tugger or forklift to move the machine with the skates. Make sure to follow safety guidelines and to move the machine at a steady, controlled pace.

6) Monitor the movement: Keep an eye on the machine during the movement to ensure that it is stable and not shifting. If the machine is moving on an incline or decline, make sure to adjust the skate position accordingly.

7) Inspect the skates: After the move, inspect the machine moving skates for any signs of wear or damage. Replace any worn or damaged parts before using the skates again.

https://www.jtlehoist.com/cargo-trolley/

Remember, safety is paramount when moving heavy machinery. Always follow proper safety protocols and use appropriate equipment to ensure the safe and efficient movement of the machine. Let me know if you need any further information or clarification!


Post time: Jun-24-2024